Before the review
- Confirm that the drawing may be shared with the supplier.
- Identify the package, revision and purpose of the review.
- Define who may answer technical questions and who may authorize a change or deviation.
When raising a question
- Point to the sheet, note, dimension or interface concerned.
- Explain what is unclear and what response is required.
- Reference related specifications or documents where they control the requirement.
- Avoid proposing an unauthorized interpretation as though it were an accepted answer.
When responding
- Identify the responsible reviewer.
- Record the clarification and its supporting source.
- State whether the drawing will change.
- Separate technical clarification from formal approval or release.
When the drawing changes
Issue the revised drawing through the authorized process, then connect the earlier question to the updated source. Do not rely on the old email answer as a substitute for the revised requirement.
Test the handoff
Ask a production or quality reviewer to recover the supplier question, engineering response, applicable revision and next action. If that requires the original participants, the record is not yet doing enough work.
Explore supplier and customer reviewRequest a workflow demo